We regularly participate in selected fairs and events, just as we ourselves, in collaboration with our suppliers and partners, hold various events with a focus on innovative and profitable automation solutions.
Gather inspiration for your journey with robotics and automation, and experience the robots of today and of the future when Technicon once again set up at Robotbrag in Odense together with a large number of other exhibitors.
The event takes place at the Technological Institute in Forskerparken from 9.30-16.30.
The pharmaceutical industry has gone through radical changes in the last years across the globe. In Europe, the pandemic has underlined the importance of a unified Europe and a strong, innovative ecosystem to address the major health challenges. With advancements in technology and policy initiatives, the pharmaceutical manufacturing landscape is further transforming.
Technicon will participate in ISPE Europe’s Annual Conference which takes place in Amsterdam. This conference draws pharmaceutical and biopharmaceutical professionals at all levels of the industry – from students and emerging leaders to the most senior executives in drug manufacturing, supply chain, devices, equipment and services, and global regulatory agencies.
Head of Industry
+45 29 49 07 89
hje@technicon.dk
This calculator shows the potentially dramatic impact in savings on a robot versus manual labor over the life of the project.
Takes only 1 minute to complete
Our calculator should be seen as an indication. With each installation, there may be other costs / savings that affect the repayment of the individual installation.Total system costs for new automation solution
Number of robots for new solution
Application of solution
Annual labor costs per operator, including employee benefits
Number of operators released per shift
(Note: % part that is released is entered on the next page)Percentage of workforce retained for system operation per shift:
Expected increased productivity
Other savings
Year
Months
Break even
Freed labor over 7 years
Productivity improvement over 7 years